Before Christmas, I replaced two of the bathrooms in Cerise. Originally, the bathrooms had showers recuperated from two other bathrooms downstairs in Poire, but the shower trays had to be installed raised from the floor in order for the waste pipes to pass. This together with corner opening doors, made it awkward to get in and out.
The main bathroom shower was taken out completely and I put in a bath with a shower over. Baths are more popular for families with small children.
T
All the pipes in both bathrooms were boxed in, to make it easier for cleaning.
This finished I decorated the hall and replaced the polystyrene ceiling with tongue and groove wood cladding.
No comments:
Post a Comment